risk-assessment

>

Install

mkdir -p .claude/skills/risk-assessment && curl -L -o skill.zip "https://agentskills.codes/api/skills/download/15190" && unzip -o skill.zip -d .claude/skills/risk-assessment && rm skill.zip

Installs to .claude/skills/risk-assessment

Activation

This is the description your AI agent reads to decide when to run this skill — the better it matches your request, the more reliably it fires.

Use when identifying, classifying, and mitigating project risks. Covers the full risk management workflow: brainstorming risks across five categories, scoring them on a probability × impact matrix, writing proactive mitigation strategies, reactive contingency plans, and maintaining a Markdown risk register.
308 chars✓ has a “when” triggerlonger than Claude Code's old 250-char listing cap (fine on current versions)

About this skill

Risk Assessment

Risk assessment ensures that a project team anticipates threats before they materialize. This skill covers the full lifecycle: identifying risks across five standard categories, scoring them on a probability × impact matrix to derive severity, assigning mitigation owners, and maintaining a living Markdown risk register. Rigorous risk assessment prevents surprise failures and ensures a contingency is ready when things go wrong.

When to Use This Skill

  • A plan is being created or updated and needs a ## Risks section populated.
  • An existing plan has no or incomplete risk coverage.
  • A project milestone is approaching and a formal risk review is needed.
  • A new technical, schedule, resource, or external change has been introduced.
  • A risk has materialized and the response plan must be activated.
  • A stakeholder asks: "What could go wrong and what are we doing about it?"

Prerequisites

  • A clear understanding of the project's goal, scope, and constraints.
  • The task list and dependency map from the plan (used to identify schedule risks).
  • Knowledge of the technology stack and team capabilities.
  • A list of known external dependencies: third-party APIs, vendors, regulations, and cloud services.

Step-by-Step Workflow

Step 1: Brainstorm Risks Across All Five Categories

Generate risks by systematically scanning each category. Target at least 2–3 risks per category.

CategoryExample Risks to Consider
ScheduleKey engineer unavailable; dependency arrives late; task durations underestimated
TechnicalThird-party API breaking change; chosen library lacks a needed feature; performance bottleneck
ResourceBudget reduction; team member departure; required hardware unavailable
ExternalRegulatory change; customer requirement change mid-project; vendor discontinues a service
QualityInsufficient test coverage; integration failures discovered late; undetected security vulnerability

Brainstorming techniques:

  • Assumption inversion: List every assumption the plan makes, then invert it. Example: "We assume the payment API is stable" → Risk: "Payment API deprecates the v2 endpoints mid-development."
  • Pre-mortem: Imagine the project failed — what went wrong? List those causes as risks.
  • Dependency scan: Review every external dependency in the task list. Each one is a potential risk source.

Step 2: Classify Risks with a Probability × Impact Matrix

Score each risk independently on two dimensions:

  • Probability: How likely is this to occur? (Low / Medium / High)
  • Impact: How severe would the consequence be if it occurs? (Low / Medium / High)

Derive Severity using this matrix:

Low ImpactMedium ImpactHigh Impact
High ProbabilityMediumHighHigh
Medium ProbabilityLowMediumHigh
Low ProbabilityLowLowMedium

Severity response levels:

  • High: Requires a mitigation plan, a contingency plan, and weekly monitoring.
  • Medium: Requires a mitigation plan and bi-weekly check.
  • Low: Document and monitor monthly; accept if mitigation cost exceeds probable impact.

Step 3: Write Mitigation Plans

For every risk with severity Medium or High, write an explicit mitigation strategy. A mitigation:

  • Is a proactive action that reduces probability or impact before the risk occurs.
  • Names an owner role responsible for executing it.
  • Is stated in one concrete action sentence.

Template:

"To reduce the [likelihood/impact] of [risk], [owner] will [specific action] by [date or milestone]."

Examples:

  • "To reduce the likelihood of API breakage, DevOps will pin the third-party API to a specific version tag and add changelog monitoring by Sprint 1."
  • "To reduce the impact of a key engineer being unavailable, the Tech Lead will ensure all critical modules have a second engineer who has reviewed the code by the end of Sprint 2."

Step 4: Write Contingency Plans

A contingency plan is the reactive response executed if the risk materializes despite mitigation. It answers: "If this happens, what do we do next?"

Template:

"If [risk event] occurs, [owner] will [specific response action], targeting [recovery outcome] within [timeframe]."

Examples:

  • "If the auth API breaks in production, DevOps will activate the cached fallback endpoint and the Backend Dev will evaluate migration to the backup provider within 2 business days."
  • "If the key engineer is unavailable for more than 3 days, the Project Lead will redistribute tasks T07–T10 to the secondary engineer per the pre-agreed contingency assignments."

Step 5: Format the Risk Register

Document all risks in the standard Markdown risk register table:

## Risks

| ID  | Category  | Risk Description                                   | Probability | Impact | Severity | Mitigation                                                | Owner       |
|-----|-----------|----------------------------------------------------|-------------|--------|----------|-----------------------------------------------------------|-------------|
| R01 | Technical | Third-party auth API breaking change breaks /login | Medium      | High   | High     | Pin API to v2.3.1; monitor changelog weekly               | DevOps      |
| R02 | Schedule  | Integration test phase underestimated, delays ship | High        | Medium | High     | Add 20% buffer to test estimates; daily standups in S3    | Tech Lead   |
| R03 | Resource  | Key backend engineer unavailable during Sprint 2  | Low         | High   | Medium   | Cross-train secondary engineer on auth module by end S1   | Tech Lead   |
| R04 | External  | Security vulnerability in JWT library              | Low         | High   | Medium   | Subscribe to CVE alerts; monthly dependency review        | Backend Dev |
| R05 | Quality   | Insufficient coverage leads to production bug     | Medium      | Medium | Medium   | Enforce 80% coverage gate in CI; QA review pre-deploy     | QA Engineer |

Column rules:

  • ID: Sequential, prefix R + zero-padded two-digit number: R01, R02.
  • Category: ONE of: Schedule, Technical, Resource, External, Quality.
  • Probability, Impact, Severity: Each must be Low, Medium, or High.
  • Mitigation: Required for Medium and High severity. One action sentence.
  • Owner: Role title. Never TBD.

Step 6: Prioritize and Schedule Reviews

  1. Sort the risk register by Severity descending (High first, then Medium, then Low).
  2. For every High-severity risk, verify both a mitigation and contingency plan exist.
  3. Assign a review cadence: High = weekly, Medium = bi-weekly, Low = monthly.
  4. Add a "Risk Review" milestone to the plan's ## Milestones section with the first review date.

Examples

Good Pattern — Complete Risk Register Entry

| R01 | Technical | Third-party auth API breaking change breaks /login | Medium | High | High | Pin API to v2.3.1; monitor changelog weekly | DevOps |
  • Risk is specific and linked to a concrete technical decision.
  • Probability and Impact are independently scored (not both defaulted to High).
  • Severity is correctly derived: Medium probability × High impact = High.
  • Mitigation is proactive — a specific version pin and changelog subscription.
  • Owner is a named role, not "TBD".

Bad Pattern — Incomplete Risk Register Entry

| R01 | General | Something could go wrong with the API | High | High | High | Monitor it | TBD |

Problems:

  • "Something could go wrong" is not actionable — the team cannot mitigate a vague risk.
  • "Monitor it" is observation, not mitigation.
  • Owner is "TBD" — nobody will act on this.
  • Both Probability and Impact defaulted to High without analysis.

Fix: Name the specific API, state the specific failure mode, write a precise proactive action with a target date, and assign a named owner role.

Troubleshooting

SymptomCauseFix
Risk register has "TBD" in mitigation columnsRisk identified but not analyzedBlock plan finalization until every High-severity risk has a completed mitigation row
All risks rated High severityMatrix not applied consistentlyRe-score each risk independently; Low-probability events are rarely High severity
Same risk listed twiceBrainstorming produced duplicatesMerge duplicates; distinguish by failure mode only if they are genuinely different scenarios
Mitigation strategies are vague ("monitor closely")Owner has not committed to a specific actionRewrite each mitigation as: action verb + specific artifact + owner + deadline
Risk register never updated after initial creationNo review cadence establishedAdd a recurring "Risk Review" milestone to the plan with a specific date